№ 38 · The 22kW Easee with a MID meter · 2026 review
Easee
Charge Max
Review verdict
Easee Charge Max decision summary
- Unit only
- £875
- VAT included
- Installed estimate
- £1,275–£1,475
- derived market estimate
- Warranty
- 5 years
- Grant position
- Approved unit
- Customer and property eligibility is separate
What stands out
Main limitation
The installed range is an estimate. The source date above is separate from the editorial review date.

The grown-up Easee. Same 256 × 193 mm body as the Easee One, same 1.6 kg, same socket with a permanent cable lock — but three-phase 22 kW, a MID Class B meter that produces legally valid readings, ISO 15118 hardware, and a five-year warranty against the One's three. It is the model Easee is consolidating its whole European range onto by the end of 2026 (the Core and Up are being dropped), so it is also the Easee with the longest support horizon. UK resellers list it at £875, £395 above the One.
The meter is the point. A MID-certified reading is what HMRC, a leasing company or a landlord will accept as proof of what a car drew, so the Max is the Easee for a company-car driver who claims home charging back, or a landlord putting a charger on a let. For a private owner who just wants 7.4 kW, the One does the same job and the premium buys three-phase capability and warranty you may never use.
Best for: Three-phase homes, company-car drivers who reclaim charging costs, and anyone who wants Easee's design with the longest warranty in the range.
Installation
Fitting the Easee Charge Max.
The Easee case for installers is unchanged: the RCD (Type A 30 mA plus 6 mA DC detection) is inside the unit, UK units carry open-PEN protection so there is no earth rod, and the backplate takes a 1.6 kg box. IP54 and IK10. On a single-phase supply it is a £400–£600 fit like the One; on three-phase it needs a 3-pole supply and, if you do not already have one, a DNO application that costs far more than the charger. Easee Link lets up to three Easee units share a supply without extra hardware, but balancing against the house — turning the car down when the oven is on — needs the Easee Equalizer, a separate CT meter at about £120, and so does solar-surplus charging. There is no tethered Max; Easee's own 5 m cable is about £150. Full walkthrough in our installation guide.
Specification
- Max Power Output
- 7.4kW single-phase (32A); 22kW three-phase (32A)
- Cable Length
- Untethered — Easee 5 m cable sold separately
- Connector
- Type 2 socket with permanent cable lock
- Connectivity
- Wi-Fi 2.4GHz, 4G LTE-M eSIM, Bluetooth 4.2, Easee Link 868MHz, RFID/NFC
- Dimensions
- 256mm × 193mm × 106mm
- Weight
- 1.6 kg
- IP Rating
- IP54, IK10
- Protection
- Type A 30mA RCD and 6mA DC detection built in; open-PEN protection on UK units
- Metering
- MID Class B, ±1% (EN 50470-3)
- Certification
- OZEV/EVCG approved (residential and workplace), ISO 15118-20, Smart Charge Point Regulations
Tariff compatibility
What it costs to run.
The weak spot, and it is the same weak spot as the One. No Easee is on Octopus's charger-led list for Intelligent Go, none is compatible with OVO Charge Anytime, and E.ON's Next Drive Smart list does not include it. A Tesla, or any car on Octopus's vehicle list, gets around this: Intelligent Go schedules through the car's own API and the Easee is just the socket. For an older EV without a supported API you are on a fixed-window tariff — Octopus Go, EDF GoElectric — with the Easee app's scheduler. If supplier-led automation is the point, the NexBlue Edge does 22 kW with Octopus and OVO links for £276 less. More in our smart-tariff chargers guide.
Best pairing
EDF GoElectric
- Off-peak rate
- 6.66p
- Saving / year
- £562
Estimated at 10,000 miles a year against the 26.32p/kWh standard rate.
Compare every tariffPrice
What you actually pay.
The unit is currently £875. £400–£600 is the working installation range, putting a typical installed total at £1,275–£1,475. Socket-only, product no. 10233, at UK resellers (Fore UK £876, installed £1,176). Easee's 5 m cable is about £150 extra and the Equalizer about £120.
Five-year total
£2,326
Charger, installation, and five years of electricity on EDF GoElectric, at 10,000 miles a year.
Less £500 if you qualify for the OZEV grant.
Against the field
How it compares.
Against the Easee One: identical looks and install, and the One is £395 cheaper. The Max adds three-phase, MID, ISO 15118 and two years of warranty. On a single-phase supply with no reimbursement to claim, buy the One. Against the NexBlue Edge: the Edge is cheaper and talks to OVO and Octopus; the Max has the meter, the internal RCD and the longer warranty. Against the myenergi zappi 22 kW: the zappi has native solar diversion and the broadest tariff support, but it is a bigger unit with a three-year warranty. Against the Wallbox Pulsar Max: a similar price for a tethered single-phase unit; the Easee buys three-phase and MID instead of a cable.
Cross-shopped with
What we loved
- PlusMID Class B (±1%) meter — readings a leasing company, HMRC claim or tenant will accept
- Plus7.4 kW single-phase or 22 kW three-phase from the same 1.6 kg body as the One
- PlusFive-year warranty, two more than the One or the Easee Charge
- PlusRCD and PEN fault protection inside the unit, so a simpler consumer-unit side than most 22 kW chargers
- PlusWi-Fi, lifetime 4G eSIM and Bluetooth; Easee Link balances up to three chargers without extra hardware
- PlusISO 15118 hardware, and the model Easee is standardising on, so the longest support life in the range
What we didn't
- MinusNo Octopus Intelligent Go, OVO Charge Anytime or E.ON Next Drive Smart integration — the car has to do it
- MinusSocket only; cable and Equalizer are extras that add about £270
- Minus£395 more than the One for features most single-phase homes won't use
- MinusEasee's Trustpilot record includes earth-fault red-light faults and chatbot-only support
- MinusThe 2023 Swedish and Dutch sales ban over RCD documentation is resolved, but it's part of the brand's history
- MinusNo display on the unit — LED strip and app only
After the evidence
Ask installers to price this exact charger.
The installation brief carries Easee Charge Max as your preference, together with the property and parking details needed for a useful response.
Related reading
Keep going →
Complete Guide to Home EV Charger Installation
Everything about installation — costs, timeline, and finding an installer.
How Much Does It Cost to Charge a Tesla at Home?
Detailed cost breakdown with off-peak tariffs and annual savings.
OZEV EV Charger Grant UK 2026
Who's eligible for the £500 government grant and how to claim.
Solar Panels and EV Charging UK Guide
Can you charge your Tesla for free with solar panels?
Best EV Charger for Solar Panels UK 2026
Ranked comparison of all solar-compatible chargers.
We'll sort the installation — up to three installers selected for postcode coverage, free and no obligation.