Skip to main content
TeslaCharger

Head to head

techtron EV7 vs Project EV APEX

The decision

The decision

techtron EV7 stands out for the lower recorded installed-price range. Project EV APEX stands out for the longer standard warranty, native solar support, three-phase support and a choice of connector formats.
techtron installed
£689–£889
£289 unit
Project EV installed
£722–£922
£322 unit
techtron warranty
3 years (main unit); 12 months on the cable and gun
Project EV warranty
5 years

Choose techtron EV7 if

you prioritise the lower recorded installed-price range.

Choose Project EV APEX if

you prioritise the longer standard warranty, native solar support, three-phase support and a choice of connector formats.

Installed ranges combine the current unit or package price with the recorded installation basis. Complex cable runs and electrical work can cost more.

techtron EV7
techtron EV7
£689–£889 installed
Project EV APEX
Project EV APEX
£722–£922 installed

At a glance

Quick stats

Installed price
£689–£889
£722–£922
Unit / package
£289 unit
£322 unit
Power
7.4kW
7.3kW / 22kW
Warranty
3 years (main unit); 12 months on the cable and gun
5 years
Type
Tethered (Type 2)
Untethered or tethered (Type 2)

Feature breakdown

The techtron EV7 has a £33 lower recorded unit or package price: £289 against £322 for the Project EV APEX.

Using each product's recorded installation basis, the techtron EV7 is £689–£889 installed and the Project EV APEX is £722–£922 installed. These are planning ranges, not quotes; cable routes and electrical remedial work can change the result.

The Project EV APEX (7.3kW / 22kW) supports three-phase charging at up to 22kW, while the techtron EV7 is single-phase only at 7.4kW. On the standard UK single-phase supply (95% of homes), both charge at roughly the same speed. Three-phase is only relevant if your property has a three-phase electrical supply.

On a standard UK single-phase supply, both will charge a Tesla Model 3 Long Range (75kWh battery) from 20% to 80% in approximately 5–6 hours overnight. Even a Tesla Model Y with its larger battery completes a typical daily top-up well within an overnight window. For the vast majority of UK Tesla owners, single-phase 7kW charging is more than sufficient — you'll wake up to a full battery every morning.

The techtron EV7 offers: techtron Smart app (scheduling, reservation charging), Adjustable charging current, 4.3-inch LCD (live voltage, current, temperature), RFID access (2 cards, 2 fobs, 2 mini tags), Wi-Fi (2.4/5GHz) and Bluetooth 5.3, OTA firmware updates. The Project EV APEX offers: Project EV app (formerly Electric Miles) with off-peak scheduling, Solar mode and dynamic load balancing (CT clamp included on APEX-7S), Wi-Fi + Bluetooth; LAN on later stock, 4G on -4G models, RFID reader, OCPP 1.6J (2.0.1 optional), PEN fault protection built in ("Pro Earth"), Cable lock keeps a cable attached to the socket version.

Breaking these down by category: for connectivity, the techtron EV7 uses Wi-Fi (2.4/5GHz) and Bluetooth 5.3, while the Project EV APEX uses Wi-Fi + Bluetooth; LAN on later stock, 4G on -4G models. For energy management, the techtron EV7 provides basic monitoring, compared to the Project EV APEX's Solar mode and dynamic load balancing (CT clamp included on APEX-7S).

The Project EV APEX supports solar integration, allowing you to divert surplus solar energy to charge your Tesla. The techtron EV7 does not have built-in solar diverting. If you have solar panels (or plan to install them), this is a significant advantage for the Project EV APEX.

The Project EV APEX supports solar diversion through its energy management system. This means it can dynamically adjust the charge rate to match your available solar surplus.

The techtron EV7 comes with a 3 years (main unit); 12 months on the cable and gun warranty, while the Project EV APEX offers 5 years. The Project EV APEX offers 2 years more coverage.

For weatherproofing, the techtron EV7 is rated IP54 (control box); IP67 (gun head only), while the Project EV APEX is rated IP65 (socket IP54), IK08. Any rating of IP54 or above is suitable for a UK outdoor installation.

Detailed breakdown

Full specs comparison

Max Power Output

techtron EV7
7.4kW (32A, single-phase); techtron rates the range up to 7.6kW
Project EV APEX
7.3kW single-phase (32A); APEX-22S three-phase 22kW

Cable Length

techtron EV7
5 metres
Project EV APEX
Untethered, or 5 m tethered (APEX-7S-T)

Connector

techtron EV7
Type 2 (tethered)
Project EV APEX
Type 2 socket with cable lock, or tethered Type 2

Connectivity

techtron EV7
Wi-Fi (2.4/5GHz), Bluetooth 5.3 — no cellular (that is the EV7+ variant)
Project EV APEX
Wi-Fi 2.4GHz, Bluetooth, RFID; Ethernet on later stock; 4G on -4G models

Display

techtron EV7
4.3-inch LCD (not touch)
Project EV APEX
—

Dimensions

techtron EV7
367mm × 228mm × 100mm (the manual's data table lists 709 × 175 × 522mm — the carton)
Project EV APEX
320mm × 190mm × 144mm

Weight

techtron EV7
4.5 kg
Project EV APEX
2.4 kg

IP Rating

techtron EV7
IP54 (control box); IP67 (gun head only)
Project EV APEX
IP65 (socket IP54), IK08

Operating Temperature

techtron EV7
-20°C to 50°C
Project EV APEX
—

Protections

techtron EV7
Over/under-voltage, over-current, leakage, over-temperature, short circuit, lightning, CP fault. Type A/B RCD and PEN fault detection are claimed on techtron's product page but absent from the installation manual
Project EV APEX
—

External Protection

techtron EV7
Manual recommends a 40A leakage-protection breaker fitted by the electrician
Project EV APEX
—

Metering

techtron EV7
No built-in electric meter
Project EV APEX
Internal; MID Class B claimed on one datasheet and absent from the next — treat as not MID

Authentication

techtron EV7
RFID — 2 cards, 2 fobs, 2 mini tags
Project EV APEX
—

Warranty

techtron EV7
Warranty policy: main unit 3 years, sockets/plugs/cables 12 months, from installation or 6 months after factory shipment, whichever is earlier. The installation manual's data table says 1 year
Project EV APEX
—

Certification

techtron EV7
OZEV-listed (DfT eligible chargepoint model list, as "Techtron - EV7", 7.6kW, residential and commercial); CE, UKCA; EN IEC 61851-1, 61851-21-2, 62196-1, 60730-1
Project EV APEX
OZEV/EVCG approved (APEX-7S, -7S-T, -4G variants), Smart Charge Point Regulations

Protection

techtron EV7
—
Project EV APEX
PEN fault protection and 6mA DC detection built in; 30mA Type A RCD required upstream

FAQ

Frequently asked questions.

The current planning ranges are £689–£889 for the techtron EV7 and £722–£922 for the Project EV APEX. They combine the recorded unit or package price with the recorded installation basis; property-specific work can change the quote.